yllix(BANNER Ad Tag)

Electrical Site Engineer July 06, 2020 at 01:42PM

Study the evaluations provided by consulting and different systems and put notes on them and the possibility of improving them. Make the necessary coordination and review them.Calculating quantities and reviewing the pricing of different items and systems.Executing items on the site. Reviewing and approving periodic abstracts.Reporting reports, progress of periodic works, making executive drawings required for implementation, determining the duration.Estiitmate the required time for each item of the required works and a request to purchase in the required materials. Determine the type of raw materials and follow up their availability in the warehouse.Follow up the work required to prepare the general site, verify the quality of the work carried out and perform the required tests.

Join Now

posted under |

0 comments:

Post a Comment

Newer Post Older Post Home

Followers

    s


Recent Comments